Electronics Manufacturing Facility
Electronics Manufacturing Facility Case Study
307kWp Solar PV install for Electronics Manufacturing Facility, Dover, Kent
Project Details
Year 2023
Category Solar

ESS Group were asked to supply a 307kWp system to supplement the existing 120kWp of installed solar at this high-tech manufacturing facility. The site had high daytime electrical bills and several large unused roofs so maximising the solar coverage made good economic sense. We designed and optimised a system to utilise the remaining roof within the constraints of the DNO export limitations imposed by the network operator. Careful selection of components to withstand the coastal location was a key part of the design process. The new installation was integrated with the legacy system to allow full monitoring and export control of the whole site.
ESS Group now maintain all the solar arrays on-site with annual O&M checks and remote online system monitoring
Related Projects
Get in Touch
We’re here to help with all your renewable energy needs.
Contact us today for expert advice, consultations, and support.